What happens when
A job with us, step by step.
From your first call to the day we sweep up. A clear plan, and knowing who does what, makes the whole job easier to live with.
From the first call to the clean-up
You ring or send the form
Tell us what you’d like. The more you tell us, the better the basic idea of cost we can give you.
We visit and measure up
We come out, measure, talk it through and walk you through every step of the process.
You get an accurate quote
A written quote for your job. Fair prices, no one-size-fits-all.
We build it, and tidy up
Stage by stage, below. When it’s done we walk you through it, backed by our quality workmanship guarantee.
Living with the build
Can we still use the back door?
Drag through a deck build, stage by stage: who is in the yard, how noisy it gets, and what you can use tonight. Your quote sets out your own job.
Stage 1 of 9
Before we start
Your yard as it is. We’ve measured up, you’ve said yes to the quote, and we’ve walked you through the plan.
All the stages as a list
- Before we start. Your yard as it is. We’ve measured up, you’ve said yes to the quote, and we’ve walked you through the plan. Who’s here: Nobody yet. Noise: None. Back door tonight: Yes (Nothing has changed.). Kids and dogs: Yes (All yours.).
- Set out. Pegs and string lines mark exactly where the deck goes, so you can see its size on the ground before anything is built. Who’s here: A carpenter. Noise: Quiet. Back door tonight: Yes (Use it as normal.). Kids and dogs: Yes (Mind the strings.).
- Footings. Holes are dug and the concrete footings go in. Then the concrete is left to set before anything stands on it. Who’s here: Our carpenters. Noise: Digging, for a day. Back door tonight: Yes (Watch your step outside it.). Kids and dogs: Careful (Keep kids and dogs away from open holes.).
- Posts and bearers. Posts stand on the footings and the bearers go across them. The saw stand and a stack of timber live in your yard for now. Who’s here: Our carpenters. Noise: Saws and nail guns, in working hours. Back door tonight: Evenings (Use another door while we work.). Kids and dogs: Careful (It’s a building site in the day.).
- Joists. Joists go across the bearers at even spacing, ready for the boards. The deck is a frame now, with no floor yet. Who’s here: Our carpenters. Noise: Saws and nail guns, in working hours. Back door tonight: Not onto it (There is a frame and a drop outside the door.). Kids and dogs: Careful (Stay off the frame.).
- Boards. The decking boards go down, fixed to every joist, laid from the house outwards. Who’s here: Our carpenters. Noise: Drills and saws, in working hours. Back door tonight: With care (You can step out onto the boards. No balustrade yet.). Kids and dogs: Careful (Watch the open edges.).
- Stairs and balustrade. The stairs go in and the balustrade goes round the open edges. The deck is safe to use. Who’s here: Our carpenters. Noise: Some. Back door tonight: Yes (Step out and try it.). Kids and dogs: Yes (Down the new stairs.).
- Patio roof. If your job has a roof: tall posts, a beam, rafters and the sheeting go on over the deck. Lights or a fan go in with our electrician. Who’s here: Our carpenters, and the sparky if needed. Noise: Some, in working hours. Back door tonight: Yes (Evenings are yours.). Kids and dogs: Yes (Mind the ladders in the day.).
- Clean-up and handover. Offcuts gone, the saw stand gone, the yard tidied. We walk you through the finished job, and it’s yours. Who’s here: Us, one last time. Noise: None. Back door tonight: Yes (Open it wide.). Kids and dogs: Yes (All yours again.).
Ready when you are.
Ring for a free quote, or send four quick details and we’ll ring you.
